Monday, 6th July 2009
Building control have been, and there’s a number of things that need doing. We need air emission valves on the basin and toilet upstairs. We need the soil stack vent pipe extending 500mm above the window (new regs), and we need the upstairs waste water to be “bossed in” to the soil stack. We’ll see how much that little lot is going to cost us.
We also need to change the bedroom window – apparently, the size of the opening is too small for it to be deemed an exit route. So either we change the (brand new) window, or convert the downstairs doors to fire doors. We’ll get a quote.
We also need to do some work on the insulation in the loft. In the bathroom cupboard, the Triso Super 10 hasn’t been installed properly, and we need some secondary insulation fitting (Rockwool was suggested).
More expense, just to get the thing finished, has us spitting chips. Or something like that.