Monday, 23rd February

Big day today :)
Floor tiles being laid
Dave got our outside tap re-installed, so now we have an outside hot and cold shower for Tess, and a separate cold tap for watering the garden and filling the motorhome fresh water tank. We also had the pipes boxed in, which will also provide the base for the side wall of the shower.

And now we have some tiles! They look really good, and we’re pleased we chose the “abstract sand” colour. Dave said he’s choosing a limestone grout, which we think sounds good.

The walls have been prepared for the “bumpy white” wall tiles. We confirmed the border mosaic tiles too.
Pipes boxed in

Although we had the timber delivered for the side dormer, the steels were too long, and needed to be cut down, which means they lost too much time to break out through the roof today. Tomorrow :)

Leave a Reply