Saturday, 21st February
More pipework going into the downstairs bathroom. Still not quite finished – just the wastes for the shower and basin to do. But we do have a dog shower!
We’ve reused the old human bath taps and shower attachment, and Adam will fit a shower tray he has lying around onto a layer of bricks.
All the loft decking is done, and a load of timber is arriving on Monday morning. Hopefully, some tiles and roof waterproof membrane too.